跳到主要內容區
:::
:::

學術期刊論文

個人資料 | 學術期刊論文 | 研討會論文 | 其他著作
學術期刊論文
  • 001|Liao, C. J., L. M. Liao, and C. T. Tseng, 2006, “A performance evaluation of permutation vs. non-permutation schedules in a flowshop,”International Journal of Production Research (Accepted). [SCI]
  • 001|Liao, C. J., Shyur, D. L., and Lin, C. H., 2006, “Makespan minimization for two parallel machines with an availability constraint,” European Journal of Operational Research, 160, pp 445-456. [SCI] [NSC-92-2213-E-011-059]
  • 002|Chen, W. J. and Liao, C. J., 2004, “Scheduling with Different maintenance Polices in a textile company,” Journal of Quality in Maintenance Engineering (accepted). [EI]
  • 003|Ying, G. C. and Liao, C. J., 2004 “Ant Colony System for Permutation Flow-shop Sequencing,” Computers and Operations Research, 31, pp 791-801. [SCI] [NSC-92-2213- E-011-058]
  • 004|Lin, C. H. and Liao, C. J., 2004, “Makespan Minimization Subject to Flowtime Optimality on Identical Parallel Machines,” Computers and Operations Research, Vol. 31, pp 1655-1666. [SCI] [NSC-92-2213-E-011-059]
  • 005|Liao, C. J. and Chen, W. J., 2004, “Scheduling under machine breakdown in a continuous industry,” Computers and Operations Research, Vol. 31, pp 415-428. [SCI]
  • 006|Ying, G. C. and Liao, C. J., 2003, “An Ant Colony System Approach for Scheduling Problems,” Production Planning & Control, Vol. 14, pp 68-75. [SCI] [NSC-92-2213- E-011-058]
  • 007|Lin, H. T. and Liao, C. J., 2003, “A Case Study in a Two-Stage Hybrid Flow Shop with Setup Time and Dedicated Machines,” International Journal of Production Economics, Vol. 86, pp 133-143. [SCI] [NSC-86-2213-E-011-001]
  • 008|Liao, C. J. and Lin, C. H., 2003, “Makespan Minimization for Two Uniform Parallel Machines,” International Journal of Production Economics, Vol. 84, pp 205-213. [SCI] [NSC-92-2213-E-011-059]
  • 009|Liao, C. J. and Chen, W. J., 2003, “Single machine scheduling with periodic maintenance and nonresumable jobs,” Computers and Operations Research, Vol. 30, pp 1335-1347. [SCI]
  • 010|Liao, L. M. and Liao, C. J., 2002, "A Tabu Search Approach for Single Machine Scheduling with Major and Minor Setups,” International Journal of Industrial Engineering, Vol. 9, No. 2, June, pp. 174-183. [SCI] [NSC-89-2213-E-011-130]
  • 011|Ying, G. C. and Liao, C. J., 2000, “A New Whitening Solution in Grey Relational Space,” The Journal of Grey System, Vol. 4, pp 327-330.
  • 012|Ying, G. C. and Liao, C. J., 2000, “Fourier Modified Non-Equigap GM(1,1),” The Journal of Grey System, Vol. 2, pp 139-142.
  • 013|Ying, G. C. and Liao, C. J., 2000, “Comments on the Generalized Admissible Region of Class Ratio for GM(1,1),” The Journal of Grey System, Vol. 2, pp 153-156.
  • 014|Pan, A. and C. J. Liao, "An Inventory Model under Just-In-Time Purchasing Agreements," Production and Inventory Management Journal, Vol.30, No.1, pp.49-52 (1989).
  • 015|Liao, C. J. and R. H. Huang, "An Algorithm for Minimizing the Range of Lateness on a Single Machine," Journal of the Operational Research Society, Vol.42, No.2, pp.183-186 (1991).
  • 016|Liao, C. J. and C. H. Shyu, "A Stochastic Inventory Model with Controllable Lead Time," International Journal of Systems Sciecen, Vol.22, No.1, pp.2347-2354 (1991).
  • 017|Liao, C. J. and C. H. Shyu, "An Analytical Determination of Lead Time with Normal Demand," International Journal of Operations and Production Management, Vol.11, No.9, pp.72-78 (1991).
  • 018|Huang, R. H., C. J. Liao and S. T. Tseng, "An Improved Algorithm for Finding Efficient Schedules with Respect to Total Flow Time and Maximum of Tardiness," Journal of the Chinese Institute of Engineers, Vol.15, No.2, pp.161-166 (1992).
  • 019|Liao, C. J., "Optimal Control of Jobs for Production Systems," Computers and Industrial Engineering, Vol.22, No.2, pp.163-169 (1992).
  • 020|Liao, C. J. and M. Rosenshine, "A Heuristic for Determining the Optimal Order in a Tandem Queue," Computers and Operations Research, Vol.19, No.2, pp.133-137 (1992).
  • 021|Liao, C. J. and C. T. You, "An Improved Formulation for the Job-Shop Scheduling Problem," Journal of the Operational Research Society, Vol.43, No.11, pp.1047-1054 (1992).
  • 022|Liao, C. J., "Optimal Release Time on a Stochastic Single Machine," International Journal of Systems Science, Vol.23, No.10, pp.1693- 1701 (1992).
  • 023|Liao, C. J., "A New Contingent Critical Ratio Technique," Inter- national Journal of Operations and Production Management, Vol.12, No.6, pp.66-74 (1992).
  • 024|Liao, C. J., "An Efficient Schedule Approach for Customer Treat- ment," Engineering Optimization, Vol.20, pp.45-55 (1992).
  • 025|Liao, C. J., R. H. Huang and S. T. Tseng, "Use of Variable Range in Solving Multiple Criteria Scheduling Problems," Computers and Operations Research, Vol.19, No.5, pp.453-460 (1992).
  • 026|Liao, C. J., "Minimizing Number of Machine Idle Intervals with Minimum Makespan in a Flow-Shop," Journal of the Operational Research Society, Vol.44, No.8, pp.817-824 (1993).
  • 027|Liao, C. J. and L. M. Liao, "Minimizing the Range of Order Completion Times with Multiple Job Classes," Journal of the Operational Research Society, Vol.44, No.10, pp.991-1002 (1993).
  • 028|Liao, C. J., "Tradeoff between Setup Times and Carrying Costs for Finished Items," Computers and Operations Research, Vol.20, No.7, pp.697-705 (1993).
  • 029|Liao, C. J., C. Pegden. and M. Rosenshine, "Planning Timely Arrivals to Stochastic Production or Service Systems," IIE Trans., Vol.25, No.5, pp.63-73 (1993).
  • 030|Ching, C. Y., C. J. Liao and C. J. Wu, "Scheduling a Bottleneck Facility for Two Production Lines," Engineering Optimization, Vol.23, pp.47-55 (1994).
  • 031|Pan, C. H. and C. J. Liao, "An Efficient Integer Programming Model of the Dynamic Lot-Sizing Problem," International Journal of Systems Science, Vol.25, No.4, pp.829-836 (1994).
  • 032|Liao, C. J., "Optimal Scheduling of Products with Common and Unique Components," International Journal of Systems Science (Accepted) (1994).
  • 033|Liao, C. J., "A New Node Selection Strategy in the Branch-and-Bound Procedure," Computers and Operations Research, Vol.21, No.10, pp.1095-1101 (1994).
  • 034|Liao, C. J. and W. H. Yang, "An Inventory System with Multiple Replenishment Scheduling," Operations Research Letters, Vol.15, pp.213-222 (1994).
  • 035|Liao, C. J. and Tsung-Shin Hsu, "The Dynamic Lot Size Model with Variable Unit Costs," International Journal of Systems Science (Accepted) (1994).
  • 036|Liao, C. J., Chien-Lin Sun and Wen-Ching You, "Flow-Shop Scheduling with Flexible Processors," Computers and Operations Research, Vol.22, No.3, pp.297-306 (1995).
  • 037|Liao, C. J. , "Optimal Scheduling of Products with Common and Unique Components," International Journal of Systems Science , Vol.27 , pp.361-366 (1996) .
  • 038|Liao, C. J. and W. C. You , "Sequencing Heuristics for Dependent Setups in a Continuous Process Industry," OMEGA , Vol.24 , pp.649-659 (1996) .
  • 039|Liao, C. J. and Cheng-Hsing Chuang , "Sequencing with Setup Times and Order Tardiness Trade-Offs," Naval Research Logistics , Vol.43 , pp.971-984 (1996) .
  • 040|Yang, W. Y. and C. J. Liao , "Group Scheduling on Two Cells with Intercell Movement," Computers and Operations Research , Vol.23 , pp.997-1006 (1996) .
  • 041|Liao, C. J. and Hung-Tso Lin , "Just In Time Manufacture of Home Sewing Machines Using Backward Scheduling," International Journal of Production Research(Accepted) (1997) .
  • 042|Ching, Chung-Yaw, C. J. Liao and C. John Wu , "Batching to Minimize Total Production Time for Two Part Types," International Journal of Production Economics , Vol.48 , pp.63-72 (1997) .
  • 043|Liao, C. J. and L. M. Liao , "Single Facility Scheduling with Major and Minor Setups," Computers and Operations Research , Vol.24 , pp.169-178 (1997) .
  • 044|Liao, C. J. and Chien-Yuan Kao , "Scheduling Nursing Personnel on a Microcomputer," Health Manpower Management , Vol.23 , pp.100-106 (1997) .
  • 045|Yang, W. Y. and C. J. Liao , "Batching and Sequencing of Jobs with Order Availability at a Single Facility," International Journal of Systems Science , Vol.29 , pp.13-20 (1997) .
  • 046|Liao, C. J. and Chon-Bin Joe , "Bicriterion Scheduling in the Two-Machine Flowshop," Journal of the Operational Research Society , Vol.48 , pp.929-935 (1997) .
  • 047|Liao, C.J. and Hung-Tso Lin , "Just In Time Manufacture of Home Sewing Machines Using Backward Scheduling," International Journal of Production Research. (Accepted) [SCI] (1998) .
  • 048|Yang, W.Y. and C.J. Liao , "Survey of Scheduling Research Involving Setup Times," International Journal of Systems Science. (Accepted)[SCI] (1998)
  • 049|Liao, Li-Man and C.J. Liao , "Single Machine Scheduling Problem with Fuzzy Due Date and Processing Time," Journal of the Chinese Institute of Engineers , Vol.21 , pp.189-196 (1998) .
  • 050|Liao, C.J. and Hung-Tso Lin , "A Case Study in a Dual Resource Constrained Job Shop," International Journal of Production Research (Accepted)[SCI] (1998) .
  • 瀏覽數:
    登入成功