學術期刊論文

個人資料 | 學術期刊論文 | 研討會論文 | 其他著作
學術期刊論文
  • 001|Wang K.-J.*, Lin J. T., and Weigert G. (2006) Agent-based single-loop interbay control in semiconductor manufacturing, Production Planning and Control, accepted. (SCI) (NSC-93-2213-E-259-026)
  • 002|Wang K.-J.* , Wang S. M. and S.-J. Yang (2006) A resource portfolio model for equipment investment and allocation of semiconductor testing industry, European Journal of Operational Research, accepted. (SCI) (NSC 94-2213-E-259-012)
  • 003|陳照文、饒忻、王孔政* (2006) 代理人協商態度推測模型之建立與評估, 中華民國 資訊學會通訊(Communication of IICM)2006 年6 月份特稿
  • 004|Wang K.-J.*, Chen J. and Lin Y.-S. (2005) A hybrid decision tree and neural network model for knowledge discovery of dispatching rules selection in semiconductor testing industry, Production Planning and Control, 16(7), 665-680. (SCI) (NSC-93-2213-E-259-026)
  • 005|Wang S.-M., Chen J., and Wang K.-J.* (2006) Resource portfolio planning of make-to-stock products using a constraint programming based genetic algorithm, Omega-International Journal of Management Science, accepted. (SSCI) (SCI). (NSC-93-2213-E-259-026) (NSC 94-2213-E-259-012) Available online 1 August 2005.
  • 006|Wang S.-M., Chen, J.-C., Wee H.-M. *, and Wang K.-J. (2006) Non-linear stochastic optimization using genetic algorithm for portfolio selection, International Journal of Operations Research, 3(1), 1-8.
  • 007|Wang K.-J.*, Hsu Y.-H., Pan C.-C. (2005) A fuzzy-neural-network model for bidding parameters of auction-based e-market, Chung Yuan Journal, 33 (2), 165-181, June 2005. (in Chinese) (NSC-93-2213-E-259-026)
  • 008|Wang K.-J., Wee H. M., Gao S, F., and Chung S.-L. (2005) Production and inventory control with chaotic demands, Omega - International Journal of Management Science, 33, 97-106. (SSCI) (SCI) (NSC-93-2213-E-259-026)
  • 009|Veeramani D. and Wang K.-J.. (2005) Design of bid construction mechanism for job flow time reduction in auction-based shop-floor control Systems, International Journal of Advanced Manufacturing Technology, accepted. (SCI) (NSC-93-2213-E-259-026)
  • 010|Wang K.-J.., Veeramani D., and Cheng, T. Y. (2004) Distributed production planning using a graph-based negotiation protocol, International Journal of Production Research, 42(15), 3077-3099. (SCI) (NSC-91-2213-E-033-041)
  • 011|Wang K.-J.* and Hou, T. C. (2003) Modeling and resolving the joint problem of capacity expansion and allocation with multiple resources and limited budget in semiconductor testing industry, International Journal of Production Research, 41(14), 3217-3235. (SCI) (NSC- 91-2213-E-033-041)
  • 012|Wang K.-J.* and Chien C. F. (2003) Designing an Internet-based group decision support system, Journal of Robotics and Computer-Integrated Manufacturing, 19(1-2), 65-77. (SCI) (NSC-90-2218-E-033-001)
  • 013|Wang K.-J.* (2003) Negotiation-based multi-stage production control using distributed shortest path algorithm, International Journal of Computer Integrated Manufacturing, 16(1), 38-47. (SCI) (NSC- 89-2213-E-033-058)
  • 014|Wang K.-J.* and Chou, C. H. (2003) Evaluating NDF-based negotiation mechanism within an agent-based environment, Robotics and Autonomous Systems, 43, 1-27. (SCI) (NSC-90-2218-E-033-001)
  • 015|Wang K.-J.* and Lin S. H. (2002) Capacity expansion and allocation for a semiconductor testing facility with a constrained budget, Production Planning and Control, 13(5), 429-437. (SCI) (NSC- 89-2213-E-033-058)
  • 016|Wang K.-J.* , Hwang K., and Lo C.-C. (2002) A heuristic algorithm for order-up-to inventory policy under unreliable material supply, Chung-Yuan Journal, 30(3), 357-366. (NSC-90-2218-E-033-001) (in Chinese)
  • 017|Wang K.-J.* and Gao S. F. (2001) Chaos in agent-based systems---Illustrations of decision-making regarding to resource selection and agent coalition, Journal of the Chinese Institute of Industrial Engineers, 18(2), 81-94.) (NSC-89-2213-E-033-008) (EI) (TSSCI )
  • 018|Wang K.-J.*, Wee H. M., Twu S. H., and Gao S. F. (2001) A look-ahead Wagner-Whitin algorithm for chaotic demands, Journal of the Chinese Institute of Industrial Engineers, 18(4), 1-12. (EI) (TSSCI ) (NSC-89-2213-E-033-008)榮獲中國工業工程學刊2002 年「工業工程論文獎」
  • 019|Wang K.-J.. and Chou C. H. (2001) Modeling of agent-based manufacturing systems, Journal of the Chinese Institute of Industrial Engineers, 18(1), 1-14. (NSC-88-2213-E-033-020) (EI) (TSSCI )
  • 020|Gong, D.-C., Chiu C.-H., Wang K.-J., Chang K.-H., Chen H.-F., and Yang M.-S., (2001) A hospital public transportation systemfs route and scheduling planning, Journal of the Chinese Institute of Industrial Engineers, 18(1), 1-14. (EI) (TSSCI )
  • 021|Wang K.-J.* and Cheng T. Y. (2000) Distributed conveyer transportation control using a negotiation mechanism, Chung-Yuan Journal, 28(3), 69-83. (NSC-88-2213-E-033-020)
  • 022|Wang K.-J.* (1998) Design of deadlock-free auction protocols for distributed shop-floor control systems, Chung-Yuan Journal, 26(3), 49-62. (NSC- 87-2218-E-033-013).
  • 023|Wang K.-J.* (1998) A demand-driven shop-floor control model for distributed manufacturing systems, Journal of the Chinese Society of Mechanical Engineers (Transactions of the Chinese Institute of Engineers, Series C: A Special Issue on Advanced Automation Technology and Production Research), 19(6), 615-623. (NSC No. 88-2213-E-033-020 and 87-2218-E-033-01). (EI)
  • 024|Veeramani D. and Wang K.-J., and Rojas, J. (1998) Modeling and simulation of auction based shop floor control using parallel computing, IIE Transactions, 30(9), 773-783. (SCI)
  • 025|Veeramani D. and Wang K.-J. (1997) Performance analysis of auction-based distributed shop-floor control schemes from the perspective of the communication system, International Journal of Flexible Manufacturing Systems, 9(2), 121-143. (SCI)
  • 026|Wang K.-J.*, Wee, H. M., Yu, J., and Kung, K. Y. (2006) Coordinated resource allocation by mutual outsourcing in decentralized supply chain, Lecture Notes in Computer Science (LNCS), accepted. (SCIe)
  • 027|Wang K.-J.*, Chih W. H. and Hwang K. (2006) A coordinated algorithm for deciding order-up-to-level of a serial supply chain in an uncertain environment, Lecture Notes in Computer Science (LNCS), accepted. (SCIe).
  • 028|Wee H. M.*, Yu J. C. P. and Wang K.-J. (2006) An integrated production-inventory model for deteriorating item with imperfect quality and shortage backordering considerations, Lecture Notes in Computer Science (LNCS), accepted. (SCIe).
  • 029|Wang S.-M., Wang K.-J.*, Wee H.-M., and Chen J.-C. (2005) An economic capacity planning model considering inventory and capital time value, Lecture Notes in Computer Science, LNCS 3483 (Part IV), 333.341, May 2005. (SCIe)