學術期刊論文

個人資料 | 學術期刊論文 | 研討會論文 | 其他著作
學術期刊論文
  • 001|Pan, C. H., "Sensitivity analysis of dynamic lot-sizing heuristics, " OMEGA, 22, Vol. 3, pp. 251-261 (1994).
  • 002|Pan, C. H. and Liao, C. L., "An efficient integer programming models of the dynamic lot-sizing problem, " International Journal of Systems Science, Vol. 25, pp. 829-836 (1994).
  • 003|Pan, C. H. and Liu, S. Y., "A comparative study of order batching algorithms, " OMEGA, Vol. 23, pp. 691-700 (1995).
  • 004|Pan, C. H. and Wu, C. C., "An asymptotic two-phase algorithm to minimize total flowtime for two-machine flowshop, " International Journal of Systems Science, Vol. 27, pp. 925-930 (1996).
  • 005|Pan, C. H., "Order batching heuristics based on spacefilling curves, " Journal of the Chinese Institute of Industrial Engineering, Vol. 13, pp. 127-133 (1996).
  • 006|Pan, C. H. and Wang, C. H., "A framework for dual command cycle travel-time model in automated warehousing systems, " International Journal of Production Research, Vol. 34, pp. 2099-2117 (1996).
  • 007|Pan, C. H., "A study of integer programming formulations for scheduling problems, " International Journal of Systems Science, Vol. 28, pp. 33-41 (1997).
  • 008|許總欣、潘昭賢、楊長林, 「以產品機能為基礎之產品定位研究」, 工業工程學刊, 第十四卷, 頁209-216 (1997)。
  • 009|Pan, J. C. and Fan, E. T., "Two-machine flow-shop scheduling to minimize total tardiness, " International Journal of Systems Science, Vol. 28, pp. 405-414 (1997).
  • 010|Pan, C. H. and Chen, J. S., "Scheduling alternative operations in two-machine flowshops, " Journal of the Operational Research Society, Vol. 28, pp. 33-41 (1997).
  • 011|潘昭賢、陳正宗, 「模擬退火法在多途程製造單元分群之應用研究」, 管理與系統學刊, 第四卷, 頁91-109 (1997)。
  • 012|Pan, J. C. H. and Su, C. S., "Single machine scheduling with due dates and class setups, " Journal of the Chinese Institute of Engineers, Vol. 20, pp. 561-572 (1997).
  • 013|潘昭賢、林建德 (1998), 「考慮單元負荷與機器途程的製造單元分群研究」, 工業工程學刊, 第十五卷, 頁231-243。
  • 014|Pan, J. C. H. and Wu, C. C., "Single machine group scheduling with bi-criteria and due date constraints, " Production Planning and Control, Vol. 9, pp. 365-370 (1998).
  • 015|潘昭賢、林國傑, 「物流中心物品儲位指派之研究」, 管理與系統學刊, 第六卷, 頁 131-150 (1998)。
  • 016|潘昭賢 (1999),「人力仲介公司認證芻議」,就業與訓練,Vol. 17, No. 2, pp. 16-20。
  • 017|潘昭賢和王學文(2000),「基因演算法在製造單元形成之研究」,中國工業工程學刊,Vol. 17, No. 6, pp. 651-670。
  • 018|潘昭賢(2000),「考慮到期日的流程型雙機排程問題」,工程科技通訊, No. 49, pp. 22-25。
  • 019|Pan, Jason Chao-Hsien, Chen, Jen-Shiang and Cheng, Hung-Liang (2001), “A heuristic approach for single machine scheduling with due dates and class setups”, Computers & Operations Research, Vol. 28, pp. 1111-1130 (SCI) (NSC86-2213-E011-017).
  • 020|Pan, Jason Chao-Hsien and Hsiao, Yu-Cheng (2001), “Inventory models with backorder discounts and variable lead time”, International Journal of Systems Science, Vol. 32, pp. 925-929 (SCI, EI).
  • 021|Pan, Jason Chao-Hsien, Chen, Jen-Shiang and Chao, Chii-Ming (2002), “Minimizing tardiness in two-machine flow-shop”, Computers & Operations Research, Vol. 29, 869-885 (SCI).
  • 022|Pan, Jason Chao-Hsien and Yang, Jin-Shan (2002), “A study of an integrated inventory model with controllable lead time”, International Journal of Production Research, Vol. 40, pp. 1263-1273 (SCI).
  • 023|Pan, Jason Chao-Hsien, Hsiao, Yu-Cheng and Lee, Chin-Jen (2002), “Inventory models with fixed and variable lead time crashing costs considerations”, Journal of the Operational Research Society, Vol. 53, pp. 1048-1053 (SCI, SSCI).
  • 024|Pan, Jason Chao-Hsien and Chen, Jen-Shiang (2003), “Minimizing makespan in reentrant permutation flow-shops”, Journal of the Operational Research Society (SCI, SSCI) (Accepted) (NSC90-2218-E011-005).
  • 025|Yang, Jin-Shan and Pan, Jason Chao-Hsien (2004), “Just-in-time purchasing: An integrated model involving deterministic variable lead time and investment in quality improvement”, International Journal of Production Research, Vol. 42, pp. 853-863 (SCI).
  • 026|Pan, Jason Chao-Hsien and Chen, Jen-Shiang (2004), “A comparative study of schedule-generation procedures for the reentrant shops”, International Journal of Industrial Engineering (SCI) Vol. 11, pp. 313-321 (NSC90-2218-E011-005).
  • 027|Pan, Jason Chao-Hsien, Lo, Ming-Cheng and Hsiao, Yu-Cheng (2004), “Optimal reorder point inventory models with variable lead time and backorder discount considerations”, European Journal of Operational Research, Vol. 158, pp. 488-505 (SCI).
  • 028|Pan, Jason Chao-Hsien and Wu, Chin-Chia (2004), “Stochastic group scheduling on single and multiple machines”, Journal of Statistics & Management Systems, Vol. 7, 87-98.
  • 029|Pan, Jason Chao-Hsien and Hsiao, Yu-Cheng (2005), “Integrated inventory models with lead time reductions and backorder discount considerations”, International Journal of Production Economics, Vol. 93, pp. 387-397 (SCI).
  • 030|Pan, Jason Chao-Hsien and Chen, Jen-Shiang (2005), “Mixed binary integer programming formulations for the reentrant job-shop scheduling problem”, Computers & Operations Research, Vol. 32, pp. 1197-1212. (SCI) (NSC90-2218-E011-005).
  • 031|Chen, Jen-Shiang and Pan, Jason Chao-Hsien (2003), “Scheduling with alternative operations in a two-versatile-machine flow-shop”, Journal of the Operational Research Society (SSCI, SCI) (NSC88-2218-E011-025) (In revision).
  • 032|Pan, Jason Chao-Hsien and Yang, Jin-Shan (2003), “An integrated inventory model with lead time and ordering cost reduction as decision variables”, European Journal of Operational Research (SCI) (In revision).
  • 033|Chen, Jen-Shiang and Pan, Jason Chao-Hsien (2003), “Integer programming models for the reentrant shop scheduling problems”, International of Journal Systems Sciences (SCI) (In revision).
  • 034|Yang, Jin-Shan and Pan, Jason Chao-Hsien (2003), “An integrated inventory model with ordering cost and setup cost reduction under just-in-time purchasing”, Journal of the Operational Research Society (SSCI, SCI) (In revision).